School Redevelopment

BGS New Building : Our New School 

We have now moved into our new building. Please see photos below of the new facilities in our new school. 

Front of New Building 

Front of school

Sports Hall 

Sports hall

School Hall 

School hall

Activity Studio 

Activity studio

School Canteen 

Canteen


On Thursday 2nd May 2019 BGS hosted the Public Consultation for the planning application to completely re-build BGS at the front of the school. 

Building work is anticipated to start in February 2020 with the new building completed in the autumn of 2021. Once completed the old buildings will be demolished and the area returned to sports field for the summer of 2022.

Parents and local residents were both impressed by the design of the new single super block building and reassured by the measures that the contractors were taking to limit disruption and disturbance to local both residents and the school during the construction phase.

IMG 8306

Funding for the work is coming from three main sources:

  1. The Priority Schools Building Programme 2 grant awarded in 2014
  2. Conditions Improvement Fund (CIF) grant awarded in 2014
  3. A contribution from the school which is partially from the ‘Bricks for Burnham’ fundraising campaign.

The money from the ‘Bricks for Burnham’ campaign was key in securing the CIF grant.

The table below shows the additional facilities that students will benefit from in the new building.  Anything in green is an improvement over current facilities.

 

Accommodation Type

Current Situation

New Build

Standard Classrooms

20* (46m2)

23 (55m2)

ICT Rich Classrooms

3

4

ICT Rich BStu Room

0

3

Seminar Rooms

5*

4 (41m2)

General  Science Labs

7 (74-83m2)

6(all 83m2)*

A Level Sci Labs

2 (93m2)

4 (90m2)

Music Room

1

1 (62m2)

DT & Food

3

3

Drama Studio

0

1(90m2)

Art Rooms

2

2

Teaching Spaces Total

43

51

Music Practice Rooms

4

3 + control rm

Hall

1(320m2)

1 (225m2)

Dining Hall

1(197m2)

1 (217m2)

Activity Studio

0

1(120m2)

Sports Hall 3 Court

0

1(7.5mxm2)

Student Toilet Areas

6 (4 very small areas)

9

6th Form Study Area

1 (107m2)

1 (109m2)

6th Form Social Area

0

1 (132m2)

SEN Rooms

1

3

Small group

0

4

Learning Resource Centre/Library

1 (110m2)

1 (162m2)

Gross Internal Floor Area

6935m2

8295m2

 

In addition to the CIF building plans we have also considered combined sports hall and refurbishment schemes, but the new build option that will become a reality represents both the best value for money for the taxpayer, but also delivers the greatest specification of facilities and the lowest short and long term running costs for the school.

In addition to the benefits for the school, the community will benefit as the sports hall, activity studio, hall and drama studio will be available for hire by the public and local clubs.  The use of the newly re-carpetted All Weather Pitch every week night and weekend is testament to the school’s commitment to its facilities benefitting the community.  Furthermore the new building will allow us to expand our work with local primary schools in the areas of art, science, design technology, geography, creative writing, maths, drama and sport.

IMG 8268